CX-028358: SMC Sign Installation

This scope covered the ground preparation, creation, construction, and installation of the sign (See Figure 2 and 3 for approximate location). It a…

Office of NEPA Policy and Compliance

April 10, 2023
Estimated Read Time   min

This scope covered the ground preparation, creation, construction, and installation of the sign (See Figure 2 and 3 for approximate location). It also includes the required solar panels, battery box, conduit, and wiring to operate lights for night viewing (see Figure 4).