Funding will support the project team's small-scale research and development of an ultra-high power density alternating current (AC) - direct current (DC) Universal Power Mover (UPM), an electrically and mechanically stackable, low-to-medium voltage compatible, reconfigurable building block technology for the purpose of enabling electrical energy flow to and from the point of use, applicable among industries that use distributed grid-tiered systems, such as EV charging and energy storage.
LM is proposing to amend Categorical Exclusion Evaluation (CXE) Form LM 11-21 to conduct project-specific safeguarding activities at fourteen open …
LM is proposing to install a backup emergency generator at the LMFSC in Grand Junction, Colorado, in Mesa County. The proposed natural gas-fueled g…
The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) is proposing to provide technical assistance to the Federal Geoth…
The DMEA vegetation management project will perform needed vegetation management along approximately 100 miles of their service territory in Cedare…
The proposed action includes Information Gathering, Analysis, and Dissemination, and the performance of geotechnical investigation and percolation …
Electrical device upgrade and replacement (over-current reclosers and communcation base stations).…
Electrical device upgrade and replacement.…
MVEA proposes to upgrade the Black Squirrel and Gresham substations to be SCADA ready. This includes upgrading six existing substation recloser con…
Western Area Power Administration (WAPA), Colorado River Storage Project (CRSP) region proposes new formula rates for the Colorado River Storage Project transmission and ancillary services for CRSP’s costs to be recovered under the Southwest Power Pool’s (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a member of SPP.