The proposed project is a 5MW/20MWh battery energy storage system (BESS), the construction of which includes minor grading, shallow foundations, an…
The B3-150 reactor laboratory contains 3 reactors that explore reactions associated with the conversion of various fuel types. Conversion can be a…
EECA proposes the dedication of three acres for the construction of a new electric substation. The site would require perimeter fencing. Site is i…
Replacement of aged/deteriorated utility poles, Reconductoring/upgrading of 1.53 miles of overhead 35kV sub-transmission lines using vibration-res…
Work consists of securing an easement along a portion of NV 225 between Owyhee and Mountain City, NV with installation of underground cable for a p…
The purpose of this project is to install a solar photovoltaic and battery energy storage system within the Community Resilience Center to provide …
The Advanced Scale Up Reactor Experiment (ASURE) facility factors heavily in the National Energy Technology Laboratory's (NETL) Gasification Multi-…
The project involves replacement of approximately 16.4 miles of existing 2/0 ACSR and No. 2 ACSR electric distribution lines with upgraded 336 ACSR…
Remove and replace 234 aging existing distribution structures, including poles, crossarms, and insulators, with new components designed to meet mod…