Phase I focuses on the team formation and finalization, pre-FEED study related to co-fire retrofit, information collection on potential co-firing i…
The proposal fits within a class of actions that is listed in Appendix B to 10 CFR Part 1021 or Appendix B and C of DOE’s NEPA Implementing Procedu…
Wood Pole Fire Resistant Coating – Identify circuits and wood poles in elevated wildfire risk areas. Once the target poles have been identified, ea…
At the project locations in southern West Virginia (including Clay, Nicholas, Raleigh, Fayette, Kanawha, McDowell, Wyoming, Lincoln, Mingo, and Boo…
This project aims to develop an environmentally friendly and economically viable hydrometallurgical method for extracting nickel (Ni) and cobalt (C…
The Recipient will replace existing transmission line conductors and associated insulators, arms and hardware with a new, advanced conductor and as…
This project will validate a critical mineral (CM) conversion technology, advancing it to bench-scale testing. Fundamental objectives include valid…
Remove and replace the existing air compressor in B-90, B-83 brick repointing, and Replace 920 plateau entrance sign. …
Prime is performing project administrative and planning activities. The subrecipient will perform the substation upgrades.…
RP No. 1 - District Substation will be converted from a 46 kV to a 161 kV substation by replacing outdated attributes. RP No. 2- install a new 1.8 …