The Kesselring Site Building 107 Refresh Project will address three key building renovation activities: a full-scale roof replacement, roof-top air handler unit replacements, and dust collection system ductwork reconfiguration.
Fire Alarm and ENS Control Panel Replacement (Pittsburgh, PA), Fire Alarm and ENS System Upgrade (Albany, OR), Utility Meter Installation (Albany, …
The U.S. Department of Energy (DOE) proposes to construct a Central Utility Plant (CUP) east of the Far Experimental Hall (FEH) Building 999 (B999)…
The Recipient will research, design, build, test, and demonstrate a flexible and innovative solid-state transformer design, designated as the Solid…
This project will integrate modular and commercially available solutions of medium voltage power-electronics and battery energy storage system (BES…
This categorical exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform installation of, or improvements to, equipment for personnel safety a…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
Sub-recipient will construct scaffolding, remove existing assemblies, demolish existing pipe and enclosure insulation assemblies and remove existin…