Transfer of Tugger Truck to PECMC. …
730-1B Renovate lobby area.…
105-C Assembly has some locations inside and outside with damaged panels and damaged outer area flashing. Transite panels containing asbestos are p…
The 704-60E trailer currently does not have a PA amplifier for its speakers and relies on amplifier in another trailer. The proposed activity is to…
Water and Ethylene Glycol mixture from Drum 6 in 211-9F will be drained into Sanitary Sewer for treatment at Central Sanitary Wastewater Treatment …
Removal and Replacement of Defense Waste Processing Facility Plant Air Compressors.…
The facility needs a redesign of the current camera grout hopper lid assembly to ease maintenance activities.…
The Stack 291-F Canyon Exhaust Fan (CAEX) No. 2 Power Analyzer is not working intermittently and will be swapped with CAEX No. 3 Power Analyzer.…
Maintenance on equipment and leaks repair for MK-18A located in building 773-A shielded cells.…
A commercial, argon atmosphere furnace in 773-A, Lab D-0142, will be used for metallic sample fabrication with trace amounts of depleted uranium an…