High-Pressure Crogenic Pump and Hydrogen Filling Station CX(s) Applied: B5.15 Date: 05/14/2012 Location(s): California Offices(s): Lawrence Livermore Site Office
Office of NEPA Policy and Compliance
May 14, 2012High-Pressure Crogenic Pump and Hydrogen Filling Station
CX(s) Applied: B5.15
Date: 05/14/2012
Location(s): California
Offices(s): Lawrence Livermore Site Office
Lawrence Livermore National Laboratory (LLNL) proposes to install a high-pressure cryogenic pump and hydrogen fueling station in the southeast corner of the Livermore site. These activities would include demolition of existing asphalt and landscape, excavation and trenching to provide utilities, installation of a dispenser for cryogenic and/or compressed gas, and excavation for installation of concrete footings.
CX(s) Applied: B5.15
Date: 05/14/2012
Location(s): California
Offices(s): Lawrence Livermore Site Office
Lawrence Livermore National Laboratory (LLNL) proposes to install a high-pressure cryogenic pump and hydrogen fueling station in the southeast corner of the Livermore site. These activities would include demolition of existing asphalt and landscape, excavation and trenching to provide utilities, installation of a dispenser for cryogenic and/or compressed gas, and excavation for installation of concrete footings.