CX-008171: Categorical Exclusion Determination

Install Extension of the Underground Natural Gas Line From Its Current Termination Point CX(s) Applied: B5.5 Date: 03/13/2012 Location(s): New York Offices(s): Brookhaven Site Office

Office of NEPA Policy and Compliance

March 13, 2012
Estimated Read Time   min
Install Extension of the Underground Natural Gas Line From Its Current Termination Point
CX(s) Applied: B5.5
Date: 03/13/2012
Location(s): New York
Offices(s): Brookhaven Site Office

This project will install an extension of the underground natural gas line from its current termination point near Building 528 to new laboratories in Building 815 at Brookhaven National Laboratory. The gas line will be a 6 inch welded gas main and will run approximately 2,180 feet through previously disturbed areas.