Install Extension of the Underground Natural Gas Line From Its Current Termination Point CX(s) Applied: B5.5 Date: 03/13/2012 Location(s): New York Offices(s): Brookhaven Site Office
Office of NEPA Policy and Compliance
March 13, 2012Install Extension of the Underground Natural Gas Line From Its Current Termination Point
CX(s) Applied: B5.5
Date: 03/13/2012
Location(s): New York
Offices(s): Brookhaven Site Office
This project will install an extension of the underground natural gas line from its current termination point near Building 528 to new laboratories in Building 815 at Brookhaven National Laboratory. The gas line will be a 6 inch welded gas main and will run approximately 2,180 feet through previously disturbed areas.
CX(s) Applied: B5.5
Date: 03/13/2012
Location(s): New York
Offices(s): Brookhaven Site Office
This project will install an extension of the underground natural gas line from its current termination point near Building 528 to new laboratories in Building 815 at Brookhaven National Laboratory. The gas line will be a 6 inch welded gas main and will run approximately 2,180 feet through previously disturbed areas.