CX-007997: Categorical Exclusion Determination

Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

February 6, 2012
Estimated Read Time   min
Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation
CX(s) Applied: B4.9
Date: 02/06/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration

The proposed project is for the Bonneville Power Administration (BPA) to grant a request from Consumer Power, Incorporated to install remote metering equipment within BPA's Harrisburg Substation and in the area immediately adjacent to the substation.