Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
February 6, 2012Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation
CX(s) Applied: B4.9
Date: 02/06/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration
The proposed project is for the Bonneville Power Administration (BPA) to grant a request from Consumer Power, Incorporated to install remote metering equipment within BPA's Harrisburg Substation and in the area immediately adjacent to the substation.
CX(s) Applied: B4.9
Date: 02/06/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration
The proposed project is for the Bonneville Power Administration (BPA) to grant a request from Consumer Power, Incorporated to install remote metering equipment within BPA's Harrisburg Substation and in the area immediately adjacent to the substation.