Summary
Western Area Power Administration (WAPA) adopted this USDA Rural Utility Service EA, which analyzes the potential environmental impacts of a proposal to construct and operate a 50 MW, gas-fired combustion turbine, and interconnect it to WAPA’s transmission system by a new substation on the existing WAPA Williston to Wolf Point 230 kV transmission line.