T-2-33CX(s) Applied: B1.22, B1.28, B1.30, B5.2, B6.1Date: 01/03/2011Location(s): Casper, WyomingOffice(s): RMOTC
Office of NEPA Policy and Compliance
January 3, 2011T-2-33
CX(s) Applied: B1.22, B1.28, B1.30, B5.2, B6.1
Date: 01/03/2011
Location(s): Casper, Wyoming
Office(s): RMOTC
The existing manifold building will be moved off site. A backhoe will be used to dig up the manifold piping, after all possible fluids have been sucked out. Wells 88-AX-28, 17 -STX-27 and 18-STX-27 will be tied directly into the tank. The remaining pipes will be cut off at the lowest point.