CX-013548: Categorical Exclusion Determination

Convert 15 ABRP Wells From the Active SVE System to Microblower Baroball SVE and Convert Two Dry A-Area Groundwater Monitoring Wells to SVE Operation CX(s) Applied: B6.9Date: 04/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations O...

Office of NEPA Policy and Compliance

April 29, 2015
Estimated Read Time   min

Convert 15 ABRP Wells From the Active SVE System to Microblower Baroball SVE and Convert Two Dry A-Area Groundwater Monitoring Wells to SVE Operation
CX(s) Applied: B6.9
Date: 04/29/2015 
Location(s): South Carolina
Offices(s): Savannah River Operations Office

The proposed action is modification of the A Area Burning/Rubble Pits (ABRP) Soil Vapor Extraction (SVE) System. Active SVE wells will be converted to passive SVE (Ref M-FCR-A-00057). Dry A-Area groundwater monitoring wells (2) will be converted to SVE operation (Rev. M-SOW-A- 00089). ABRP wells (15) will be converted from the active SVE system to Microblower Baroball SVE.

Document(s) Available for Download