Based on DOE/EA-1692, FONSI for the Red River Activated Carbon Manufacturing Facility.
Construction and Operation of a Proposed Cellulosic Biorefinery, BlueFire Fulton Renewable Energy, LLC, Fulton, Mississippi
FONSI for the construction and operation of geothermal production wells and a seismic monitoring network in Bristol Bay Borough, Alaska.
FONSI for the construction and operation of a 30 megawatt wind power facility.
Based on DOE/EA-1699, a FONSI for the Pope/Douglas Third Combustor Expansion Project.
Williston to Tioga Transmission Line Project, North Dakota
FONSI for transfer of land within Kirkland Air Force Base to the Lovelace Respiratory Research Institute and to the USAF.
Proposed Development and Demonstration of a Biomass Energy Center for Food Processing Applications, Topeka, Kansas
Based on DOE/EA-1683, FONSI for a 280-megawatt concentrating solar power plant and associated 230-kilovolt transmission line.
General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, White Marsh, Maryland, and Wixom, Michigan