DOE/EA-2220: Documents Available for Download

RSS
The Department of Energy has prepared an environmental assessment for the proposed construction and operation of a new Environmental Monitoring Laboratory (EML) at the Savannah River Site near Aiken, South Carolina. To support the EML, a Health Protection Complex Wastewater Neutralization Facility would also be constructed and operated.
Natural Fluctuation of Water Level in Par Pond and Reduced Water Flow in Steel Creek below L Lake at the Savannah River Site
Construction and Operation of the Regulatory Monitoring and Bioassay Laboratory at the Savannah River Site, Aiken, South Carolina (related to EA-1022)
The Department of Energy (DOE) has prepared an Environmental Assessment (EA) for a project proposed by NOXSO Corporation for the cost-shared design, construction, and operation of the NOXSO SO2/NOX Removal Flue Gas Cleanup System. DOE has determined that the proposed Federal action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act.
Banner Color
Light Text on a Dark Overlay (Default)