DOE/EA-2220: Documents Available for Download

RSS
Center for Integrated Nanotechnologies at Sandia National Laboratories/New Mexico, Sandia Site Office, Kirtland Air Force Base, Albuquerque, New Me...
East Altamont Energy Center, LLC (EAEC LLC), a wholly owned subsidiary of Calpine Corporation applied to the Department of Energy (DOE), Western Area Power Administration (Western) to interconnect the East Altamont Energy Center (EAEC), a 1100-megawatt (MW) natural gas-fired power plant, to Western’s Tracy Substation. EAEC LLC intends to serve competitive regional markets in California with power from the EAEC. Western proposes to make modifications at its Tracy Substation to accommodate the interconnection. The EAEC is a merchant plant which means that it would be independent of other generators and that the power generated would serve the open market rather than any particular utility or load. All financial responsibility for the EAEC would be borne by EAEC LLC.
This Supplement Analysis (SA) has been prepared to determine if previous Department of Energy (DOE), National Nuclear Security Administration (NNSA) environmental assessments (EAs), including EA-1429 Environmental Assessment for Proposed Access Control and Traffic Improvements at Los Alamos National Laboratory, Los Alamos, New Mexico adequately address the environmental effects of a proposed modification to the location and alignment of a bypass road at Technical Area (TA) 3, or if this EA or others need to be supplemented.
The U.S. Department of Energy (DOE) proposes to raise the biosolids land application radionuclide loading limits from the current, self-imposed 4 mrem/yr lifetime loading to the Tennessee Department of Environment and Conservation (TDEC)-approved level of 10 mrem/yr. The planning level increase is necessary for industrial development within the Oak Ridge community. In addition, DOE proposes to allow the discharge of treated wastewaters from the West End Treatment Facility (WETF) to the Y-12 Plant and City of Oak Ridge sanitary sewer systems, resulting in an operational cost savings of
approximately $133,000 per year.
Construction and Operation of the Molecular Foundry at Ernest Orlando Lawrence Berkeley National Laboratory, Berkeley, California
Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites, DOE Grand Junction Office, Grand Junction, Colorado
Banner Color
Light Text on a Dark Overlay (Default)