RSS
The Department of Energy is adopting an environmental assessment completed by the Department of the Interior's Bureau of Land Management in December 2007 that analyzed the potential environmental impacts associated with the construction and startup of Nevada Geothermal Power, Inc.'s Blue Mountain Geothermal Development Project located in Humboldt and Pershing Counties, Nevada.
Based on the analyses in the Environmental Assessment, DOE determined that its proposed action - awarding a federal grant to Toxco, Inc. to establish a new lithium-ion battery recycling plant - would result in no significant adverse impacts.
Toxco, Incorporated Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Lancaster, Ohio
The Department of Energy conducted an environmental assessment that analyzed the potential environmental impacts associated with the A123 Systems, Inc., battery manufacturing operations for hybrid electric vehicles and plug-in hybrid electric vehicles.
Based on the analyses in the Environmental Assessment, DOE determined that its proposed action - awarding a federal grant to Pyrotek, Inc. for its expansion of an existing manufacturing plant - would result in no significant adverse impacts.
Based on the analyses in the environmental assessment, DOE determined that its proposed action - awarding a federal grant to EnerG2 for the reconfiguration of an existing warehouse into a manufacturing facility - would result in no significant adverse impacts.
DOE/EA-1690 analyzes facilities to support A123 Systems battery manufacturing for hybrid vehicles.
Decontamination and Demolition of Building 310 at Argonne National Laboratory
Analyzes an advanced direct current bus capacitor manufacturing facility for electric drive vehicles.
General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative Application White Marsh, Maryland and Wixom, Michigan