RSS
Department of Energy's Bonneville Power Administration prepared a Mitigation Action Plan for the Uma-Birch Floodplain Reconnection Project (DOE/EA-2215).
DOE prepared this FONSI based on impacts identified in DOE/EA-2215 to evaluate the Uma-Birch Floodplain Reconnection Project.
DOE prepared an EA (DOE/EA-2215) to evaluate the Uma-Birch Floodplain Reconnection Project.
DOE prepared an EA (DOE/EA-2215) to evaluate the Uma-Birch Floodplain Reconnection Project.