Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to repair two washout areas on an existing access road between stru…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 29/2 through 30/1 on the Archer-Steg…
DOE LM seeks to expand the scope of activities under Checklist LM 06-19 to include the use of manned aerial vehicles to supplement investigations a…
DOE LM is proposing to conduct a regenerative grazing study at the Shirley Basin South, Wyoming, Disposal Site (SBS). The study would investigate s…
DOE LM proposes to conduct a regenerative grazing study at the Shirley Basin South, Wyoming, Disposal Site (SBS).…
LM propses to transition the long-term care and custody of the Split Rock, Wyoming, Disposal Site from Western Nuclear Incorporated (WNI) to LM.…
Spence Substation Stage 02 Construction…
CX-022752: Miracle Mile-Snowy Range No. 1 115-kV Transmission Line Vegetation Management (Hand Work)
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Miracle Mile-Sno…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Miracle Mile-Sno…
CX-022754: Snowy Range Substation Stage 04 Construction and Interconnection and Gem City Tap Removal
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to approve an interconnection request from Tri-State Generation and…