Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 217, 218, 219, 220 and 221 on the St…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remodel the existing first floor women’s and men’s restrooms, ad…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency optical ground wire (OPGW) repairs on its existing Gore …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Vernal-Hayden (V…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine maintenance to one structure on its Hesperus-Wat…
Glen Canyon-Navajo 230-kV Transmission Line Structure Footer Maintenance…
Western Area Power Administration (WAPA) proposes to conduct “danger tree” management along its Flatiron-Pole Hill (F-PH) 115-kV, and Estes-Pole Hi…
Spence Substation Stage 02 Construction…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to re-route a portion of the right-of-way (ROW) on its Airport-Boyd…
CX-022752: Miracle Mile-Snowy Range No. 1 115-kV Transmission Line Vegetation Management (Hand Work)
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Miracle Mile-Sno…