Transmission and Distribution Line Structure Replacements…
Curecanti-Morrow Point No. 1 230-kV Transmission Line and Curecanti-Morrow Point No. 2 13.8-kV Distribution Line Access Road and Right-of-Way Maint…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road maintenance on existing roads used t…
Western Area Power Administration (WAPA), a Federal Power Marketing Administration of the Department of Energy, is publishing in the Federal Regist…
Rocky Mountain Region (RMR) is using a minor rate adjustment process to convert the existing rates for short-term sales for RMR to use under the We…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 2, 8, 11, 12, 13, 16, 17, 22, and 27…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine herbicide application for vegetation management …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to repair damaged optical ground wire (OPGW) on a portion of its ex…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace 16 existing Structures 9/1, 21/15, 22/1-22/3, 29/11, 35/…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace less than 20 miles of existing Structures 269 through 41…