BPA proposes to transfer ownership of its Centralia-May Street 69-kilovolt (kV) No. 1 transmission line and easement (.16 miles) and May Street-B S…
BPA proposes to replace insulators, remedy impairments, improve access roads, and install fall protection along the approximately 26-mile-long Wine…
BPA proposes to allow Clark County Public Works (Clark County) to install and operate a stream gauge on BPA fee-owned right-of-way (ROW) south of s…
BPA proposes to replace two switches with new switches that meet safety and quality standards.…
Research, drafting, editing, and publishing a white paper on coal-to-hydrogen challenges (including waste coal) and opportunities for state utility…
BPA proposes to fund the Washington Department of Fish and Wildlife (WDFW) to repair a section of the Sandhill Road in the Bridgeport Unit of the S…
BPA proposes to install a new heating, ventilation, and air conditioning (HVAC) system at BPA’s Covington Substation Maintenance Headquarters build…
Award Number: DE-EE0007819, CX(s) Applied: A9, B3.6, B5.15, Water Power Technologies Office, Location(s): WA, Office(s): Golden Field Office
CX-102058: Effective Knowledge Dissemination for LMI Solar: The Roles of CBO's and State Governments
Award Number: DE-EE0009360, CX(s) Applied: A9, A11, Solar Energy Technologies Office, Location(s): WA, Office(s): Golden Field Office
BPA proposes, jointly with Natural Resources Conservation Service, to fund Asotin County Conservation District to develop livestock water sources o…