Bonneville Power Administration (BPA) proposes to allow the Cowlitz Public Utility District (PUD) to remove poles from BPA fee-owned land outside L…
Bonneville Power Administration (BPA) proposes to perform landing work and insulator replacement on Chief Joseph – Monroe No. 1 structure 43/6 in t…
BPA is proposing to fund the Confederated Tribes of Colville Reservation (CTCR) to purchase the Beaver Creek Valley View property. BPA would hold a…
Bonneville Power Administration (BPA) proposes funding the Yakama Nation to monitor and sample juvenile steelhead and coho salmon to obtain estimat…
To maintain reliable power to the region, Bonneville Power Administration (BPA) proposes to replace a wood structure in line mile 14 with a steel m…
The U.S. Department of Energy (DOE) is proposing to provide funding to the University of Washington (UW) to upgrade and deploy hydrophone instrumen…
CX-026182: Site Characterization Borehole/Well Drilling at the Washington Nuclear Plant (WNP-1) Site
Characterization and monitoring of WNP-1 site hydrology will require shallow and deep groundwater well pairs. …
BPA is in the planning stage for equipment replacement of acclimation facilities for fall Chinook smolts at the existing Prosser Hatchery, located …
Bonneville Power Administration proposes to renovate and expand the Hazardous and Toxic Materials Handling Building (HMB) located at the J.D. Ross …
The U.S. Department of Energy’s (DOE) Solar Energy Technology Office (SETO) is proposing to provide funding to the National Renewable Energy Labora…