BPA proposes to replace an undersized 36-foot-long culvert with a larger 72-inch-diameter by 75-foot-long culvert, and install adjacent stabilizing…
The U.S. Department of Energy, Richland Operations Office, proposes to provide the Washington State Department of Transportation a temporary constr…
Bonneville Power Administration (BPA) proposes to have a BPA revenue meter installed in the control house of the City of Richland’s new substation …
Bonneville Power Administration (BPA) proposes to fund the Kalispel Tribe (the Tribe) to continue the rearing of triploid rainbow trout (TRBT) at t…
BPA is proposing to fund the Confederated Tribes of Colville Reservation (CTCR) to purchase the Highway 20 property.…
Bonneville Power Administration (BPA) proposes to interconnect an 80 megawatt (MW) solar development to BPA’s electrical system.…
Bonneville Power Administration (BPA) proposes to fund the Colville Confederated Tribes (CCT) to perform aerial seeding operations to restore nativ…
Bonneville Power Administration (BPA) proposes to allow AT
Bonneville Power Administration (BPA) proposes to exchange property with Kittitas Public Utility District (KPUD) and allow KPUD to construct a new …
BPA proposes to replace approximately 4.3 miles of existing fiber optic cable on its Snohomish-Bellingham fiber system along the Monroe-Custer No 1…