The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
Install a 76.8 kWh Battery Energy Storage System (BESS) to operate in conjunction with the pre-existing solar photovoltaic (PV) array at Kids are U…
Lease of property located at 901 D Street SW, Washington DC (10th Floor) by NNSA (NA-84). This lease action will involve approximately 10,000 squar…
The U.S. Department of Energy (DOE) is proposing to provide federal funding for the Marine Energy Collegiate Competition (MECC), a prize competitio…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Solar and Storage Industries Institute (SI2) to develop strategies, …
The U.S. Department of Energy (DOE) is proposing to authorize the administration of Round 2 Inspire Track of a prize competition (The American-Made…
The U.S. Department of Energy (DOE) is proposing to authorize the administration of Round 2 of a prize competition (The American-Made Challenge: Co…
The U.S. Department of Energy (DOE) is proposing to authorize the administration of a prize competition known as the American-Made Industrial Energ…
The Department of Energy is proposing to provide funding to The American Association of Blacks in Energy (AABE), headquartered in Washington, D.C. …
The U.S. Department of Energy (DOE) is proposing to authorize the administration of a prize competition known as the FY25 Renew America's Schools -…