Categorical Exclusion Determinations: Texas

The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perform the work in connection with inspection, testing, and repairs of the Pond 7 (Brine Pond) and Pond 37 (Oil Recovery Pond) liner system.
Golden Pass LNG Terminal LLC (GPLNG) filed an application (Application) with the Department of Energy’s (DOE) Office of Fossil Energy and Carbon Management (FECM) on June 26, 2025.