Subcontractor shall provide labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision to perform work in …
This project would address the demolition and disposition of Buildings 12-011 and 12-011A. …
This project would review the demolition and disposition of Pantex Ramp 11-R-016 and Facility 16-010B.…
The U.S. Department of Energy (DOE) is proposing to authorize the administration of the fourth and final phase (Test Contest) of Round 1 of a prize…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Cybersecurity Manufacturing Innovation Institute (CyManII) to be DOE's s…
Funding will support the project team's research and development of their Geomechanical Pumped Storage (GPS) methodology that uses the Earth as a m…
System Configuration Analysis of a 300 kWth Pressurized MSW-Biomass Co-gasifier
Coal and coal ash sampling in active mines and power plants in TX, LA, MS, AK, and AL. Analyze samples. Generate outcrop belt map(s). Geospatial mo…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of Texas at El Paso (UTEP) to develop reversible meta…
Subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision necessary to pe…