Receipt and Processing of Transuranic (TRU) Soils from Nuclear Fuel Services in Erwin, Tennessee by the TRU Waste Processing Center on the Oak Ridge Reservation, TennesseeCX(s) Applied: B6.1Date: 02/01/2010Location(s): TennesseeOffice(s): Environmental...
Conducting Macroencapsulation Treatment in the Parking Lot of the Contact Handled Marshalling Building at the Transuranic Waste Processing Center on the Oak Ridge Reservation, TennesseeCX(s) Applied: B6.5Date: 02/01/2010Location(s): TennesseeOffice(s):...
Evaluation Project (4492)CX(s) Applied: B1.3, B2.5Date: 01/28/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
Building 9204-2E Vacuum System Upgrade (4489)CX(s) Applied: B1.3, B2.2Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
Chiller Booster Pumps (4487)CX(s) Applied: B1.3, B2.2Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
Clean Sweep Building Clean Out (4490)CX(s) Applied: B6.1, B6.8Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
Compressed Gas Cylinders (4491)CX(s) Applied: B6.1, B6.8Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
Miller Picking Air Handling Unit (AHU) Replacement (4488)CX(s) Applied: B1.3, B2.2Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
MotoMesh Deployment Phase II (4486)CX(s) Applied: B1.3, B2.2Date: 01/05/2010Location(s): Oak Ridge, TennesseeOffice(s): Y-12 Site Office
Neutron imaging of metal hydride beds at Oak Ridge National Laboratory, Spallation Neutron SourceCX(s) Applied: B1.11, B1.13, B3.6Date: 12/30/2009Location(s): TennesseeOffice(s): Sandia Site Office