New Fuel Cell Membranes with Improved Durability and Performance CX(s) Applied: A9, B3.6 Date: 09/18/2013 Location(s): Minnesota, Michigan, Tennessee Offices(s): Golden Field Office
Timber Salvage from Pine Ridge Storm Damage CX(s) Applied: B1.3 Date: 09/17/2013 Location(s): Tennessee Offices(s): Oak Ridge Office
Easement to Tennessee Valley Authority for Bethel Valley Substation and Transmission Line Feeds and Clearing of Trees within the Project Area at the Oak Ridge National Laboratory CX(s) Applied: B1.24, B4.11, B4.12 Date: 09/12/2013 Location(s): Tenness...
Injecting Carbon Dioxide into Unconventional Storage Reservoirs in the Central Appalachian Basin... CX(s) Applied: B3.1, B5.3, B5.5, B5.13 Date: 09/09/2013 Location(s): Tennessee Offices(s): National Energy Technology Laboratory
Leveraging Industry Research to Educate a Future Electric Grid Workforce CX(s) Applied: A9, A11 Date: 09/05/2013 Location(s): Tennessee Offices(s): Golden Field Office
Natural Refrigerant High Performance Heat Pump for Commercial Applications CX(s) Applied: B3.6 Date: 08/28/2013 Location(s): Tennessee Offices(s): Golden Field Office
Advanced Biomass Feedstock Supply Chain for Lower Cost, Higher Quality Feedstock Delivery CX(s) Applied: A9, B5.15 Date: 08/26/2013 Location(s): Ohio, Iowa, Iowa, Kansas, Tennessee Offices(s): Golden Field Office
Security Upgrade Project CX(s) Applied: B1.3, B1.11 Date: 08/22/2012 Location(s): Tennessee Offices(s): Y-12 Site Office
Operational Simulation Tools and Long Term Strategic Planning for High Penetrations of Photovoltaic in the Southeastern US CX(s) Applied: A9 Date: 08/15/2013 Location(s): Tennessee Offices(s): Golden Field Office
Serration Behavior of High Entropy Alloys CX(s) Applied: B3.6 Date: 08/14/2013 Location(s): Tennessee Offices(s): National Energy Technology Laboratory