Provide Electrical Power for New Tool Storage Building and Portable Crew Shacks CX(s) Applied: B2.5 Date: 11/18/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sample Analysis of Savannah River Site Tank Farm Chemical Cleaning CX(s) Applied: B3.6 Date: 11/18/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Federal Bureau of Investigations Radiological Dispersion Device Training CX(s) Applied: B1.2 Date: 11/10/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Add Time Delay to 772-1F Main Exhaust/Supply Air Interlock Circuit CX(s) Applied: B2.3 Date: 11/10/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Heat Exchanger Removal and Disposition CX(s) Applied: B6.1 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Maintenance Excavation of the B-07 Outfall Ditch CX(s) Applied: B1.3 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Vegetative Response to Metal Exposure in a Growing Media CX(s) Applied: B3.6 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Sampling of Nuclear Fuel Assembly CX(s) Applied: B3.6 Date: 10/27/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace Degraded Chemical Hood Exhaust Duct in 735-A, D-wing Service Floor CX(s) Applied: B2.3 Date: 10/25/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Edible Oil Deployment for Enhanced Chlorinated Volatile Organic Compounds Attenuation at the M Area Abandoned Process Sewer Line CX(s) Applied: B3.1 Date: 10/25/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office