Eliminate the Capability to Transfer HB-Line Filtrate Solution (Tanks NT-51/52) to H Canyon Tank 8.8 CX(s) Applied: B2.5 Date: 04/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dismantle and Remove (D&R) and Replace 773-A D-Wing Air Handling and Condensing Units CX(s) Applied: B1.3 Date: 04/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Autoclave (Model SSR-3A-ADVPB) Operation, Building 772-25B, Room 10 CX(s) Applied: B3.6 Date: 04/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Synthesis of Plutonium Halide Compounds CX(s) Applied: B3.6 Date: 04/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Carolina Blue Skies Initiative CX(s) Applied: B5.22 Date: 04/25/2012 Location(s): South Carolina Offices(s): National Energy Technology Laboratory
Carolina Blue Skies Initiative CX(s) Applied: B5.22 Date: 04/25/2012 Location(s): South Carolina Offices(s): National Energy Technology Laboratory
Semi-Permanent Sleeve Removal and Disposition CX(s) Applied: B1.28 Date: 04/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Renovation of E-Wing Ventilation, Building 773-A CX(s) Applied: B2.1 Date: 04/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Heating Actinide Materials in a 2.9 volume % Hydrogen Atmosphere Using a Laboratory Furnace in the C-155 Glovebox CX(s) Applied: B3.6 Date: 04/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dismantling of 735-A and 735-11A Chillers and Condensers CX(s) Applied: B1.23 Date: 04/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office