Metal Recycling Storage Pad CX(s) Applied: B1.15 Date: 03/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operation of Induction Furnace Fabrication Lab CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Microfluidics for Advanced Separation and Ultrasensitive Detection CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator CX(s) Applied: B1.25 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Mechanical Isolation of Plant Air System at TNX CX(s) Applied: B1.27 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
707-C Roof Replacement CX(s) Applied: B1.3 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Electrochemistry in Ionic Liquids CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operations in Laboratory 773-A, B135/139 CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
235-F Risk Reduction and Deactivation CX(s) Applied: B1.28 Date: 03/12/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Correct Obstruction in the Sprinkler System on Level 3 of HB-Line CX(s) Applied: B2.5 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office