Electrical Operations Staff to Perform Yard Maintenance in Electrical Substations CX(s) Applied: B1.3Date: 04/02/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Waste Treatment Plant (WTP) Design Verification Testing CX(s) Applied: B3.6Date: 03/31/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
105-K Failed Tension Rod Disposition CX(s) Applied: B2.5Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Automatic Condensate Valve on 108-1K Compressed Air System Receiving Tanks CX(s) Applied: B2.5Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 773-A; E-131, E-133 CX(s) Applied: B1.3Date: 03/31/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Work in the 723-A High Pressure Laboratory CX(s) Applied: B3.6Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Burial of 13.8-kV Overhead Line in Burial Ground CX(s) Applied: B4.6Date: 03/31/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Replace Section E B Block Cell Exhaust (CE) Fans CX(s) Applied: B1.3Date: 03/30/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office
Establish Digital Density Meter Analytical Capability in 735-A, D-wing CX(s) Applied: B3.6Date: 03/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install a Metal Awning at 703-1B Over Entrance to Telecom Facilities CX(s) Applied: B1.3Date: 03/25/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office