Rapid Prototyping Machines Support Research and Development CX(s) Applied: B3.6 Date: 08/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace River Water Pelton Valves and Remove Existing Valve Houses CX(s) Applied: B1.3. Date: 08/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Leaks over Rooms 12, 15, Hallway at 772-25B CX(s) Applied: B1.3 Date: 08/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 716-N CX(s) Applied: B1.3 Date: 08/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 704-3N CX(s) Applied: B1.3 Date: 08/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 773-A CX(s) Applied: B1.3 Date: 08/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Roadway Rights-of-way Maintenance CX(s) Applied: B1.3 Date: 08/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at the South End of 722-4A CX(s) Applied: B1.3 Date: 08/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof at 773-51A CX(s) Applied: B1.3 Date: 08/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Subcontractor Repair of Roof Leaks at 730-2B CX(s) Applied: B1.3 Date: 08/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office