Retrieval of several Filter Housings disposed of into Waste Container TF00003046.…
This EEC is written to cover treatability work associated with the Salt Batch 11 Qualification samples.…
We will be releasing D2O to the atmosphere within the pine forest at SRS and sampling it downwind using Universal Gas Analyzers, bagging air sample…
Four wells (CRW025C, CRW026C, CRW027C and CRW028C) will be installed adjacent to a tributary of Castor Creek to monitor the effectiveness of an Emu…
The U.S. Department of Energy National Nuclear Security Administration Office of Material Management and Minimization, proposes to provide financia…
The U.S. Department of Energy National Nuclear Security Administration Office of Material Management and Minimization, proposes to provide financia…
A treatability study will be performed to inject natural artesian groundwater from two nearby production wells in D-Area into the upper water table…
Construction will remove asbestos insulation and replace with non-asbestos insulation.…
Remove Ductwork in Front of Chiller Unit 004 in Building 785-6A. Subcontractor will repair/rebuild the Chiller Unit and replace ductwork.…
Install Wacker Neuson Model G-25 (Serial# 24367879) Reciprocating Internal Combustion Engine (RICE) Unit (SRSR00595) at 901-Z, Ronnie Scott's Hut…