Install a new HVAC system at Building 709-7G Fire Station at 'C' & '5' Roads.…
Provide safety upgrades to the two (2) Bridgeport Milling machines in Building 717-F.…
Current fire alarm detection system is obsolete. Spare parts are no longer available. System does not comply with NFPA 72 requirements. This modifi…
Renovation of restroom in Building 710-14N.…
Replace Trailer Space Roll Door Cover, North Side Purification. Door cover may contain asbestos/galbestos material and PCBs.…
This modification will replace the Electronic Safeguards and Security System (E3S) in the Tritium Extraction Facility (TEF) with the Lawrence-Liver…
The Lab 106 will be modified to provide space for SRNL Analytical Services to perform clean reagent preparation when their organization moves from …
This EEC covers the operation of the AccuTOF-DART time-of-flight mass spectrometer. Investigation of inorganic and organic chemicals on the surface…
Corrosion testing of stainless steel with simulated sea salt will be performed in 999-2W. …
The proposed work will involve studying effectiveness of VCIs (Vapor Corrosion Inhibitors) in the presence of bacterial activity.…