This EEC covers various routine maintenance activities that occur in the buildings within the MOX Complex Area.…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
Remove Asbestos Presumed Asbestos Containing Material (PACM) gaskets, then remove leaking valve RWW-101 and replace with new valve, reinstall insul…
The proposed activity involves repositioning of copper service lines in 773-A C-143/147 (RBA).…
Project Management and Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…
This EEC is for the design to update valve actuator and limit switch for H-233000-DET-HV-1267331 (aka DS-118) per M-DCF-H-13811.…
Clean Air Handling Unit (AHU) No. 5 drain line at Building 772-F.…
702-A Water Intrusion Recovery.…
Proposed modificaton installs electrical componets for Saltstone Screw Feeder System upgrade.…
Construction to pour concrete pad for outdoor unit installation East side of 704-72S and install Ductless Heat Pump on pad and install three High W…