Replace HVAC Heat Pumps and Air Handling Units for Buildings 247-H and 248-H. Existing units are original components and have reached the end of th…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
TCAP Column B, along with TCAP Product Storage Bed A are to be replaced by new components.…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in B…
A concrete pad and pre-fabricated picnic shelter will be erected at the SREL Conference Center.…
Install Pizza Ovens in 766-H.…
Replace walkway (footbridge) at 645-4N.…
Pour new concrete pad at 713-N roll-up door.…
The 711-4N Lead Melter Complex includes a lead melter (10,000 lb) and supporting structures (dress-out hut, machining/tooling booth, material stora…
Confinement ventilation in the Materials Test Facility (MTF) building 234-7H is maintained by the existing H-Area Old Manufacturing (HAOM) building…