Remove/Repair fan baseplate and motor from 903-C fan and replace in 903-A fan if the fan malfunctions.…
717-11A Repair water damage and leak.…
Replace CL4132 Tank and Supply Pump at 780-1A used for process water.…
SRTE will vent 1 cylinder of Neon (Barcode No. 2006720)…
SRTE will vent 1 cylinder containing Carbon Dioxide
SRTE will vent 2 cylinders of Argon (Cylinder No. LTL153-RR-CM and LTE203-RR-CM)…
SRTE will vent 1 cylinder of Helium (Cylinder No. LTE024-RR-PG)…
General chemical and nanomaterial research support for Material Science and Clean Energy projects will be performed in various labs at the Applied …
Scope: R and D project requires the use of a Stud Welder to assemble the support structure.…
The EEC covers the sealing and coating of the base of south east corner of building 711-9N.…