200 Area Chilled Water PlantCX(s) Applied: B1.15Date: 01/25/2010Location(s): IllinoisOffice(s): Science, Argonne Site Office
Joint BioEnergy Institute Lease and Operation of Greenhouses at University of California at DavisCX(s) Applied: A7, B1.3, B1.15, B3.6Date: 01/19/2010Location(s): Davis, CaliforniaOffice(s): Science, Berkeley Site Office
Infrastructure Improvements for Innovative Confinement Concept (ICC) Experiments with American Recovery and Reinvestment Act FundingCX(s) Applied: B3.13Date: 01/13/2010Location(s): New JerseyOffice(s): Princeton Site Office, Science
Operation and Maintenance of the Building 211 Linac AcceleratorCX(s) Applied: B3.10Date: 12/16/2009Location(s): IllinoisOffice(s): Science, Argonne Site Office
Operation and Maintenance of 3-Mega Electron-Volt Van De Graaf AcceleratorCX(s) Applied: B3.10Date: 12/16/2009Location(s): IllinoisOffice(s): Science, Argonne Site Office
Investigation of Photoactive Devices and CatalystsCX(s) Applied: B3.6Date: 12/16/2009Location(s): IllinoisOffice(s): Science, Argonne Site Office
Dismantling, Removal and Decommissioning of Contaminated Ducting and Associated Equipment in the Plutonium Facility Fan Loft and Basement of Building 350 (New Brunswick Laboratory)CX(s) Applied: B1.17, B1.16, B1.3, B6.1, B2.5Date: 12/10/2009Location(s)...
Install a Photovoltaic Power Generation Array and Electric Car Charging Stations, Environmental Molecular Sciences LaboratoryCX(s) Applied: B1.15Date: 09/30/2009Location(s): Richland, WashingtonOffice(s): Science, Pacific Northwest Site Office
331 Building Irrigation Upgrades, 300 AreaCX(s) Applied: B2.5Date: 09/23/2009Location(s): Richland, WashingtonOffice(s): Science, Pacific Northwest Site Office