This Amended Determination follows the approval of additional milestones and an extended period of performance to support the project team's small-…
The proposed stormwater and industrial water improvements are designed to meet current industrial permit limits and prepare for future development at the Bettis Laboratory Site.
CX-027614: Pennsylvania State University-Synthesis of Consists as Rolling Energy Micro-grids (SCORE)
This Amended Determination follows the approval of additional tasks to support the project teams information gathering and analysis efforts to deve…
The project houses an X-ray photoelectron spectrometer. Sample surfaces are energized in the vacuum system and a resultant spectrum is produced to…
Direct Air Capture (DAC) research for removing carbon dioxide from air. Facilities to house lab/bench scale reactors (2"dia and 12"x12" cross secti…
DOE is administering Congressionally Directed Spending to the Philadelphia Energy Authority (PEA) to fund the administrative, education, outreach, …
The U.S. Department of Energy’s (DOE) Weatherization Assistance Program (WAP) is authorized per Title IV of the Energy Independence and Security Ac…
Removal of PFAS containing AFFF from buildings 64 and 92 by removing the fire foam systems and installing new dry pipe water systems.…
Improve the temperature performance by at least 150 degrees Celsius of ceramic matrix composite (CMC) materials in high-hydrogen environments using…