Modification to Demolish Building 900A and Reconstruct Building 900 Project CX(s) Applied: B1.3, B1.15 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 65 and Building 74 Loading Dock Railing Project CX(s) Applied: B2.1, B2.3 Date: 06/28/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh B901 Mezzanine Project CX(s) Applied: B1.15, B1.23, B2.3 Date: 06/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Pittsburgh Building 84 Gas Line Project CX(s) Applied: B2.5 Date: 06/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Evaluation of High Capacity Cells for Electric Vehicle Applications CX(s) Applied: B3.6 Date: 06/03/2013 Location(s): China Offices(s): National Energy Technology Laboratory
A Universal Combustion Model to Predict Premixed and Non-Premixed Turbulent Flames in Compression CX(s) Applied: A9 Date: 04/25/2013 Location(s): Other Location Offices(s): National Energy Technology Laboratory
American Samoa Government State Energy Program· Annual Grant CX(s) Applied: A9, A11 Date: 09/06/2012 Location(s): American Samoa Offices(s): Golden Field Office
Low Cost Flexible Production System for Remote Ultra Deepwater Gulf of Mexico Field Development CX(s) Applied: A9 Date: 06/19/2012 Location(s): France Offices(s): National Energy Technology Laboratory
Renewable Energy Ground Mounted Photovoltaic Grid System Overflow CX(s) Applied: B5.16 Date: 03/29/2012 Location(s): Other Location Offices(s): Golden Field Office
Improving Recycling Capacity and Solid Waste Education in American Samoa CX(s) Applied: B1.31, B1.35, A9 Date: 12/21/2011 Location(s): American Samoa Offices(s): Golden Field Office