Measuring changes in ambient noise levels from the installation and operation of a wave energy converter in the coastal ocean Award Number: DE-EE0006387 CX(s) Applied: B3.3 Water Power Program Date: 06/04/2015 Location(s): OR Office(s): Golden ...
Keeler-Forest Grove Transmission Line Structure Relocations CX(s) Applied: B4.6Date: 06/03/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Azura Demonstration at the Navy's Wave Energy Test Site Award Number: DE-EE0006923 CX(s) Applied: A9, B3.6 Water Power Program Date: 05/20/2015 Location(s): OR Office(s): Golden Field Office
USC Autoclave (2014 SARS Modification) CX(s) Applied: B3.6Date: 05/19/2015 Location(s): OregonOffices(s): National Energy Technology Laboratory
B26 Corrosion Lab - Modification to add Confocal Microscope to Project CX(s) Applied: B3.6Date: 05/07/2015 Location(s): OregonOffices(s): National Energy Technology Laboratory
Transmission Line Wood Pole Replacements and Access Road Maintenance within Bonneville Power Administration's the Dallas District CX(s) Applied: B1.3Date: 05/04/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Southern Cross Fee Title Funding CX(s) Applied: B1.25Date: 04/30/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Redmond-Pilot Butte #1 Wood Pole Replacements CX(s) Applied: B1.3Date: 04/29/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Solar Vacuum Furnace CX(s) Applied: B3.6Date: 04/28/2015 Location(s): OregonOffices(s): National Energy Technology Laboratory
Oregon City Station Service Replacement CX(s) Applied: B1.3Date: 04/27/2015 Location(s): OregonOffices(s): Bonneville Power Administration