BPA is proposing to fund Polk Soil and Water Conservation District (PSWCD) to purchase the Smithfield Oaks property, which is a 179-acre parcel of …
BPA proposes to fund the Nez Perce Tribe’s installation and operation of a new Passive Integrated Transponder (PIT) tag array on the north bank of …
Bonneville Power Administration (BPA) proposes to acquire additional right-of-way (ROW) easement along the Brasada-Harney-No. 1 transmission line t…
Re-roof B23.…
Award Number: DE-EE0008098, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): OR, Office(s): Golden Field Office
BPA proposes to remove the outdated control house at Maupin Substation to accommodate additional equipment to meet future needs. Equipment used to …
BPA proposes to sell Norway Substation to Coos-Curry Electrical Cooperative. The property is comprised of 1.32 acres of BPA fee-owned land. CoosCur…
Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, A11, B3.1, NREL, Location(s): OR, Office(s): Golden Field Office
The Bonneville Power Administration (BPA) proposes to install a new Power Control Assembly (PCA) building and to remove the existing control house …
Bonneville Power Administration proposes to fund the Confederated Tribe of Warm Springs, as part of the Columbia Basin Fish Accords, to perform rou…