Bonneville Power Administration (Bonneville), along with the U.S. Army Corps of Engineers and the U.S. Bureau of Reclamation, proposes a second Ame…
Bonneville Power Administration (Bonneville), along with the U.S. Army Corps of Engineers and the U.S. Bureau of Reclamation, proposes a second Ame…
Bonneville Power Administration (BPA) proposes to transfer ownership of several hatchery facilities within the exterior boundaries of the reservati…
Bonneville Power Administration (BPA) proposes to fund the Walla Walla Basin Watershed Council (WWBWC) to reconnect a series of cold-water springs …
BPA proposes to correct 25 impairments on the Big Eddy- Redmond 230-kV No. 1 line. The impairments encroach on the maximum allowed distance (MAD) b…
Bonneville Power Administration (BPA) proposes to fund Oregon Department of Fish and Wildlife (ODFW) to construct, fabricate, and install fish scre…
Transmission electron microscope (TEM) analysis to provide the user with information relating to the internal microstructure, crystallography, and …
Bonneville Power Administration (BPA) proposes to fund operation and maintenance activities within Oregon Department of Fish and Wildlife’s (ODFW) …
Bonneville Power Administration (BPA) proposes to fund the Walla Walla Watershed Basin Council to implement a fish passage project to include; remo…
Bonneville Power Administration (BPA) proposes a Memorandum of Understanding (MOU) with the Confederated Salish and Kootenai Tribes (CSKT) to conti…