Testing of tension, compression, low and high cycle fatigue crack growth rate, room and elevated temperature hardness, impact, and those based on f…
Formulate and melt new alloys and heat treat alloys to form new materials for evaluation in other projects.…
Conduct Vacuum Arc Remelting (VAR), Electroslag Remelting (ESR), and Button Melting. Produce metal or metallic alloy castings or "ingots." Create s…
This project changes the physical dimensions of metal alloys along with their microstructure, thus physical properties such as hardness are changed…
Bonneville Power Administration (BPA) proposes to fund the Columbia River Estuary Study Taskforce (CREST) to implement a channel reconnection proje…
Bonneville Power Administration (BPA) proposes to fund Oregon Department of Fish and Wildlife (ODFW) to restore fish passage, channel complexity, a…
Provide improvements to the site main entry to the site, including driveway widening, replacement of sidewalk and curbs, additional parking spaces,…
Research into the creep phenomena of materials in the presnce of gaseous species with or without water vapor.…
The Bonneville Power Administration (BPA) proposes to fund the Union County Soil and Water Conservation District (USWCD) to improve two irrigation …
BPA proposes to fund the Confederated Tribes of Warm Springs Reservation of Oregon (CTWS) to implement 165 acres of Western juniper removal on a 49…