The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to Medford Irrigation District (MID) to install a …
Bonneville Power Administration (BPA) proposes to temporarily remove the 15 kilovolt (kV) station service cable located beneath Ridder Road between…
Bonneville Power Administration (BPA) proposes to remove the tops from approximately 16 trees that are currently either blocking, or at risk of blo…
The Bonneville Power Administration (BPA) proposes to fund the Pacific Northwest National Laboratory (PNNL) and Columbia River Estuary Study Taskfo…
Bonneville Power Administration (BPA) proposes to remove approximately 337 trees that are currently either blocking, or at risk of blocking, the mi…
Bonneville Power Administration (BPA) proposes to construct a new 230-kV bay at the McNary Substation, and relocate, replace, and install new trans…
Bonneville Power Administration (Bonneville) plans to enter into a long-term Memorandum of Agreement (Agreement) with the Coeur d'Alene Tribe. The …
Tillamook Substation is an existing BPA facility in Tillamook County, Oregon. The proposed project would replace electrical equipment experiencing …
Bonneville Power Administration (BPA) proposes to replace in-kind replacement of wood pole structures and associated structural/electrical componen…
BPA proposes to sell the BPA Cascade Locks Substation to the City of Cascade Locks. The proposed activity would be to sell the BPA substation and t…