The American Electric Power's (AEP's) Buckrun Switch to West Crawford 69 kV Transmission Line Rebuild Project will rebuild approximately 6.12 miles of existing linear transmission line infrastructure generally within its existing 60-foot-wide right-of-way (ROW) between the existing Blanchard Station and West Crawford Station (main line) and between the main line and South Vanlue Station, in Hancock and Wyandot counties, Ohio.
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Lima, Ohio, for the design and inst…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the State of Ohio Department of Development to design and install an…
Relocation, spacer cable technology, and converting overhead distribution from overhead to underground in areas in Ohio with trees out of right-of-…
The DOE Loan Programs Office (LPO) is considering whether to issue a loan guarantee of a funding facility to American Electric Power (AEP, or the Applicant) pursuant to its authority under the EIR 1706 Program.
The U.S. Department of Energy (DOE) is proposing to provide federal funding to The Ohio Office of Energy and Environment (OH EEO) for the design an…
The scope of activities for this project will be the installation of equipment, equipment reconductoring and existing wooden pole replacement along…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Case Western Reserve University (CWRU) (Cleveland, OH) for the devel…