Re-seal Polyurethane Overcoat on BH Substation Relay Building 814CX(s) Applied: B1.3Date: 04/07/2010Location(s): TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Replacement of Big Hill Deep Anode Ground Bed Site for Cavern 114CX(s) Applied: B1.3Date: 03/16/2010Location(s): Big Hill, TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
West Hackberry Site Security Detection Systems Upgrade (Install)CX(s) Applied: B2.2Date: 03/03/2010Location(s): West Hackberry, LouisianaOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
West Hackberry Tank (WHT)-1 and WHT-10 Liner Removal/RelineCX(s) Applied: B1.3Date: 03/01/2010Location(s): West Hackberry, LouisianaOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Replace Bryan Mound Oil/Water SeparatorsCX(s) Applied: B1.3Date: 03/01/2010Location(s): Bryan Mound, TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Bayou Choctaw Replacement Vacuum TruckCX(s) Applied: B1.3Date: 02/22/2010Location(s): Bayou Choctaw, LouisianaOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Clean, Inspect, and Repair BMT-27CX(s) Applied: B1.3Date: 02/11/2010Location(s): TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
West Hackberry Air Conditioning/Heating RepairsCX(s) Applied: B1.3Date: 02/05/2010Location(s): West Hackberry, LouisianaOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
West Hackberry Annual Pressure Safety Valve TestingCX(s) Applied: B1.3Date: 02/05/2010Location(s): West Hackberry, LouisianaOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office
Project Number WH-09-119 - Replace Fiberglass Covers/Troughs on Traveling Screens at West Hackberry Raw Water Intake StructureCX(s) Applied: B1.3Date: 01/12/2010Location(s): West Hackberry, LouisianaOffice(s): Fossil Energy, Strategic Petroleum Reserve...