New York-City-SyracuseCX(s) Applied: A9, A11, B1.32, B5.1Date: 06/16/2011Location(s): Syracuse, New YorkOffice(s): Energy Efficiency and Renewable Energy
New Jersey-City-Hamilton, Township ofCX(s) Applied: A9, A11, B2.5, B3.5, B5.1Date: 06/16/2011Location(s): Hamilton, New JerseyOffice(s): Energy Efficiency and Renewable Energy
New Jersey-City-Edison, Township ofCX(s) Applied: A9, A11, B5.1Date: 06/16/2011Location(s): Edison, New JerseyOffice(s): Energy Efficiency and Renewable Energy
Recovery Act ? Clean Energy Coalition Michigan Green FleetsCX(s) Applied: A7Date: 06/16/2011Location(s): MichiganOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
California-City-IndioCX(s) Applied: A9, A11, B1.32, B2.5, B3.6, B5.1Date: 06/16/2011Location(s): Indio, CaliforniaOffice(s): Energy Efficiency and Renewable Energy
Wind Forecasting improvement ProjectCX(s) Applied: B3.1Date: 06/15/2011Location(s): Cleburne, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
Port of Galveston Solar Energy ProjectCX(s) Applied: A9, B3.1Date: 06/15/2011Location(s): Galveston, TexasOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Crump Geyser - High Precision Geophysics and Detailed Structural Exploration and Slim Well DrillingCX(s) Applied: A9, B3.1, B3.7Date: 06/15/2011Location(s): OregonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Topic 7A, Emergency Backup Power SystemsCX(s) Applied: A9, B5.1Date: 06/15/2011Location(s): GeorgiaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
1) Create a green revolving loan fund, 2) installation of a green roof covering on the Criallo Science and Technology Center, 3) retrofit building lighting system at the Municipal Government Building, 4) feasibility study for establishing a wind farm including installation of 2 meteorological towers to collect data, 5) installation of an approximate 5 kW solar photovoltaic system and LED lighting and solar-powered lighting in parking lot at the Mariolga Head Start Center, 6) installation of an approximate 5 kW solar photovoltaic system on the Santa Elvira Community Center, and 7) installation of solar hot water heaters and photovoltaic systems on approximately 45 residences and the Villa Turabo Community Center.