Categorical Exclusion Determinations: Office of Energy Efficiency and Renewable Energy

Allison Hybrid Assembly, Test, and Development; Activities at 2 Indianapolis Locations (Eagle Creek Technology Center and Speedway Campus)CX(s) Applied: A9, B1.4, B1.24, B1.31, B2.1, B5.1Date: 11/30/2009Location(s): Indianapolis, IndianaOffice(s): Ene...
United States Army Corps Niagara River, New York Small HydropowerCX(s) Applied: A9, A11Date: 11/30/2009Location(s): Niagara River, New YorkOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Advanced Battery Manufacturing Equipment and Facilities ProgramCX(s) Applied: B1.24, B1.31, B5.1Date: 11/30/2009Location(s): Lyon Station, PennsylvaniaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Rhode Island Ocean Area Management Plan (Ocean Samp)CX(s) Applied: A9, B3.3Date: 11/30/2009Location(s): Rhode IslandOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Energy Efficient Electronics Cooling ProjectCX(s) Applied: A9, B3.6Date: 11/30/2009Location(s): IndianaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Energy Efficiency Lighting Retrofits and Lighting Control Upgrades, Historic Preservation Educational Materials, Bike PathCX(s) Applied: A1, A9, B1.32, B2.5, B3.6, B5.1Date: 11/30/2009Location(s): Idaho Falls, IdahoOffice(s): Energy Efficiency and Rene...
Columbia Gorge Community College Wind Energy Workforce Training NacelleCX(s) Applied: A9, B3.6Date: 11/30/2009Location(s): OregonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Install Photovoltaic Roof and Insulation System on Florissant Ice RinkCX(s) Applied: B5.1Date: 11/30/2009Location(s): Florissant, MissouriOffice(s): Energy Efficiency and Renewable Energy